AAI Height NOC Consultant for Rooftop Solar & Buildings | Naksha Solutions

AAI height NOC for buildings and rooftop solar

Solar mounting structures raise your building's highest point. If that point crosses the height in your AAI NOC, you need a fresh clearance. We survey, calculate and file it for you.

Building with rooftop solar panels rising above the permissible top elevation line, with an aircraft on approach Permissible top elevation (AMSL) Solar adds 1–3 m Ground / site elevation (AMSL)

Building near an airport? Get height clearance before plan approval

New residential towers, hospitals, factories, chimneys and telecom masts inside an airport's zoning area need an AAI NOC. We secure the height your design needs, with survey data AAI can rely on.

Runway approach surface sloping up over new buildings of different heights Runway Obstacle limitation surface Within limit

NOC expiring, rejected or out of date? We sort it out

Revalidation before expiry, a fresh NOC for revised height, or an appeal to the MoCA Appellate Committee, each backed by a DGPS survey of your exact coordinates and AMSL elevation.

DGPS receiver on a tripod surveying a building, next to an NOC certificate with a stamp WGS-84 · AMSL NOC

Do I need an AAI NOC for rooftop solar?

Yes, if your building is inside an airport's height-restricted zone and the solar structure takes the building above the permissible top elevation in its existing NOC, or if the building never had an NOC. AAI measures the topmost point above mean sea level (AMSL), including every superstructure. A flush-mounted array that stays within the permitted height usually needs no new clearance; an elevated structure often does.

Why solar panels change your NOC height

Rooftop solar has grown fast across India, helped by schemes such as PM Surya Ghar for homes and open-access targets for businesses. To avoid shading and to use the roof below, many installers raise panels on steel structures, often one to three metres above the terrace.

Your AAI NOC does not grant a number of floors. It grants a permissible top elevation in metres AMSL, and the NOC terms say structure height includes any superstructure. Lift rooms, water tanks, antennas, hoardings and now solar frames all count.

Top elevation = Site elevation (AMSL) + Building height + Rooftop structures
Must be ≤ Permissible top elevation in your NOC

Buildings designed close to their limit have the least headroom. A society or commercial complex that used its full permitted height can cross the line with even a modest elevated array, and the NOC can then be questioned during inspections, occupancy, sale or subsidy verification.

Quick solar height check

Enter figures from your NOC and drawings to see how much headroom is left.

Indicative only. Final values depend on surveyed elevation and AAI assessment.

Which height NOC do you need?

Most clients come to us unsure which application applies. Here is how we place each case.

New NOC

Fresh application on NOCAS

A new building, tower, chimney, mast or industrial structure inside an airport's zoning area, before plan approval or construction.

We survey the site, compute the likely permissible height, prepare the application and follow it through to issue.

Revised height NOC

Solar, extra floor, tank, antenna

An existing building whose top elevation will rise above its current NOC, most commonly after rooftop solar, an added floor or new terrace equipment.

We measure the as-built top elevation, compare it with your NOC and apply for clearance at the revised height.

Revalidation

Before the NOC expires

Your NOC is nearing the end of its validity and construction is incomplete or delayed for reasons outside your control.

We check the conditions in your NOC letter and file revalidation in time. Requests after expiry are not entertained.

Appeal

MoCA Appellate Committee

AAI has refused the NOC or permitted less height than the project needs.

We review the assessment, prepare technical grounds and support the appeal, or suggest design changes such as low-tilt solar.

How we get your NOC

  1. Site and document review

    We review drawings, any existing NOC and the solar layout, and check which airports and authorities apply.

  2. DGPS survey

    Our team records WGS-84 coordinates of the site corners and the site elevation in AMSL with DGPS equipment.

  3. Height calculation

    We compute the proposed top elevation, including every rooftop structure, and flag risk before you apply.

  4. NOCAS application

    We prepare and submit the online application with correct coordinates, heights and supporting documents.

  5. Follow-up with AAI

    We track the application, answer queries from the designated officer and arrange any site verification.

  6. NOC and compliance

    You receive the NOC with a plain summary of its conditions, validity and the height you must stay within.

Documents to keep ready

  • Site plan or layout showing plot boundary and building footprint
  • Ownership or authority document for the property
  • Building section showing total height, lift room and terrace structures
  • Solar layout with mounting structure height above roof
  • Existing AAI NOC letter, for revision or revalidation
  • Applicant details and authority letter, if a society or company applies

Coordinates and AMSL elevation come from our DGPS survey, so you don't need to arrange them.

Who we work with

Anyone whose structure has to stay within an airport's height limits.

Housing societiesApartment ownersCommercial complexesSolar EPC companiesRooftop solar installersBuilders and developersHospitals and schoolsFactories and warehousesTelecom tower ownersArchitects and PMCs

For solar EPCs and installers

Add an NOC check to your site survey. We can assess a batch of rooftops, tell you which ones need clearance and handle the filings, so installations and subsidy claims are not held up.

Why Naksha Solutions

Survey firm, not a paperwork agent

AAI does not verify the coordinates and elevation you submit. If they are wrong, the NOC can be declared void. Our DGPS survey gives you data that holds up.

Height checked before you apply

We calculate the full top elevation, including solar frames and terrace equipment, so there are no surprises after construction.

One team, end to end

Survey, drawings, NOCAS filing, AAI follow-up and appeals are handled by the same team that understands your site.

Practical design options

When headroom is tight, we suggest workable solar layouts, such as lower tilt or reduced structure height, before you spend on steel.

Frequently asked questions

Do I need an AAI NOC to install rooftop solar panels?

If your building lies within an airport's height-restricted zone, any rooftop addition that raises the top elevation, including solar mounting structures, must stay within the height permitted by AAI. If the new top elevation exceeds your existing NOC, or there is no NOC, you need a height clearance NOC from AAI through NOCAS.

Why does a solar installation change my building height for NOC purposes?

AAI assesses the top elevation of the structure above mean sea level, including any superstructure. Elevated solar structures, often 1 to 3 metres above roof level, raise the highest point of the building and can push it above the permissible top elevation.

My building already has an AAI NOC. Do I need a new one after adding solar?

Only if the new top elevation exceeds the permissible top elevation in your NOC. If it does, a fresh NOC for the revised height is required. We compare your existing NOC with a surveyed top elevation to confirm.

What is NOCAS?

NOCAS (No Objection Certificate Application System) is the Airports Authority of India's online portal for applying for height clearance NOCs for buildings, masts, chimneys and other structures near airports.

How is building height measured in an AAI height NOC?

The NOC states a permissible top elevation in metres above mean sea level (AMSL). Maximum structure height equals the permissible top elevation minus the site elevation, and it includes any superstructure such as lift rooms, water tanks, antennas and solar structures.

How long is an AAI height NOC valid?

Recent AAI height NOCs are typically valid for 8 years from the date of issue, with a one-time revalidation allowed under conditions stated in the NOC letter. Revalidation requests are not entertained after validity expires, so check your NOC's terms early.

What documents are needed for an AAI height NOC?

Typically: accurate WGS-84 site coordinates, site elevation in AMSL, proposed building height including superstructures, site plan, ownership or authority document, and for revisions or revalidation, a copy of the existing NOC.

Why does AAI need an accurate DGPS survey?

AAI does not verify the coordinates and site elevation supplied by the applicant. If the actual data is found to differ, the NOC can be declared null and void. A DGPS survey gives defensible coordinates and AMSL elevation.

What if AAI permits less height than I need?

Options include redesigning the rooftop, such as lower-tilt or flush-mounted solar, or filing an appeal with the Appellate Committee of the Ministry of Civil Aviation within the permitted time.

Do I need a Defence NOC as well?

If the site lies within the jurisdiction of a defence aerodrome, a separate NOC from the defence authority is needed in addition to, or instead of, the AAI NOC. We check this during the site assessment.

AAI NOC consultancy across Gujarat and India

Based in Vadodara, we handle height NOCs for sites around civil and defence airfields in Gujarat and take up projects across India.

  • Vadodara
  • Ahmedabad
  • Surat
  • Rajkot
  • Bhavnagar
  • Jamnagar
  • Bhuj
  • Kandla / Gandhidham
  • Porbandar
  • Keshod
  • Deesa
  • Pan-India projects

Get your site checked

Tell us about the building and the solar plan. We'll reply with the NOC you need and what it will take.

  1. We review your details and check the nearest airports and their height limits.
  2. We call you back within one working day to confirm the scope.
  3. You get a clear quote covering survey, filing and follow-up.

Solar installer

Site location

or

In Google Maps: tap the site, then Share, then Copy link.
Click or drag the pin onto your building

Send us your site location and solar plan

We'll tell you whether you need a new NOC, a revised NOC or nothing at all, and what it will take.